Saturday, September 13, 2014

Carpet

I went with a commercial carpet tile. I've had great luck with rubber backed tiles especially in potentially damp situations. 

I don't plan on it getting damp down there... EVER! but you never know.
Plus it's so easy to install.

You can also see the paint color.

Time for some cove base, and it's pretty much done!

Sunday, August 31, 2014

Walls done and painted

I've got the walls done primered.  We picked out a dark tan paint for the walls and will get that done the next couple of days.
... then, it is time to clean up the for carpet!

Monday, August 18, 2014

Ceiling is done!

I really hate cutting drywall in. Especially on the ceiling now. I had a couple of light fixtures and an air supply that I needed to do, but the drywall lift made it simple!!!

Now time to play with Spackle for the next week or so....   And time to order some carpet!

Ceiling in the storage room

I've never done a drywall ceiling before, and I have to say, this drywall lift is awesome!!  Glue the joists, raise up the drywall and boom!!
You know I like to do everything myself and don't like asking for help, so this makes the job that much better!

Sunday, August 10, 2014

Hearing, Ventilation, Air Conditioning

A lot of people neglect this phase when they are finishing their basement. It is very important to get air flow down in your basement. Mold, rot and various smell will plague you if you don't get this right. I was easily able to tap into some of the ventilation from the upper floor.

Drywall time!

I purchased 20 sheets of 54" drywall / 12 ft sheets.  I wanted to have as few seams as possible and I think when you get it in this size, it is actually cheaper once you are all said and done.






 This is the workshop wall...





This is the wall inside of the storage closet.




Ceiling


I was able to install the furring strips on the ceiling today.  Since I am going to drywall the ceiling (for maximum height, and lower cost) I needed to mount these spacing pieces to the ceiling so that I could put up the drywall without running into problems with the electrical conduit and other things that are already up on the ceiling.


Wednesday, August 6, 2014

Insulation in progress

I'm insulating the walls of the rooms and the ceiling for sound.  The ceiling also needs to be insulated because of the floor heating system I installed.  Its a nasty job, but somebody has to do it.


Wednesday, July 2, 2014

Electrical Time





I finished the electrical for the lighting and the outlets on the one side of the wall.  This includes a discreet outlet for a wall mounted flat screen TV.

Additionally, I needed to install the under-the-floor heating system for the kitchen that resides above this room.  That took some time!

Sunday, June 15, 2014

Finishing the framing

This is the storage closet.  I still have to frame up the soffit and finish the electrical.
The most of what I have been doing over the past two months is re-wiring a lot of the electrical and getting the workshop straightened out.  I had to remount all of my cabinets and run separate lighting and outlet circuits for my equipment.


This is the closet looking West - Ive complete some of the electrical outlets so far.

Sunday, March 16, 2014

Walls going up

Well, I was able to get the walls up... most of them.


This is the west wall and the north wall that will define the space for my lab / workshop.







And this wall is on the South side of the room and will define the pantry, electrical closet, and the bathroom.

Sunday, March 9, 2014

Basement Time!

... and so it begins... March 9th, 2014.
Ive got a clean slate here to work with.  I relocated my workshop to the north part of the basement and cleared everything out of the way.

Sunday, May 27, 2012

Five years in the making - Time for a remodel!

Since we have been in our home for about 5 years now, we decided that it was time to do a remodel of our Master Bedroom.  For what ever reason, that was the only room that we didn't have anything interesting as far as the ceiling goes.  We were supposed to have a tray, but when they started building it, they trayed the ceiling DOWN, which meant that the ceiling would be at the 9ft level, and the tray would slope down toward 7.5 ft.   Unacceptable in my opinion, so I had them stop.  That was 5 years ago and I have been thinking about doing something with the ceiling ever since!

Here is a picture of what the bedroom looked like before.

The cottage look worked for the Cape Cod home in Homewood, but Clair wanted to try her hand at something different.

I wanted something different with the ceiling and Clair showed me some pictures of what she liked.
I had a vision, HOWEVER, Clair had the master plan!!  Wait 'til you see what happened.

(**Pay no attention to the dates on these blogs.  They are arbitrary and are sequenced so that all of the posts are in sequential order.  The FIRST part of this project started the second week of January and took 5 weeks.)

Sunday, May 20, 2012

It all started with the ceiling - Bedroom Project Phase 1



It all started when I took the drywall down off of the ceiling.  One of the hardest parts of the job was to remove all of the blow-in insulation from the attic so that it wouldn't turn in to a "snow fall" when I started to take down the drywall.  It was practically impossible to get it all out of the attic, so as you can see on the floor, there was plenty of insulation falling all over the place as I took parts of the ceiling down.

Check out my time-lapse YouTube video of the tear down:
Youtube Video

Saturday, May 19, 2012

Home Run!!

The unfortunate part of this project is that there were three home runs that went to various sections of the house.  One of the set of circuits came through the ceiling fixture in the bedroom.  Since the fixture was going to have to be completely moved, this was going to add to the work.  One of the home runs had wire going from the electrical box to a junction box about 60 feet away.  A challenge indeed!

Friday, May 18, 2012

Re-Run

Believe it or not, one of these conduits was completely empty, so that was awesome - I just eliminated it and focused on the other three and how I would re-route the circuits for the second floor and the south east part of the house (consisting of the bathroom and master closet).

Thursday, May 17, 2012

Garbage control






In typical fashion, I didn't get a dumpster.  I didn't want to draw any attention to the fact that I was just going to do a little drywall patch work in my bedroom, so I packaged all of the garbage in 55 gallon heavy duty trash bags.  Over the next 4 weeks, all 11 bags eventually were taken by the regular garbage man. :-)

At this point, I believe it is sometime at the end of January - Notice the snow on the porch.

Wednesday, May 16, 2012

Ready to rock!

Well, this is what the ceiling looked like when I pulled all of the drywall down.  All that is left to do is to remove these rafters and raise them up about 18 inches.  BUT, there is a problem.


The right side of the rafters are integrated into the structure of the wall, so I will have to cut them out...  Which will make the rafters shorter than what I need.  Paul comes through with exactly the number of 2X8 boards I need.

Tuesday, May 15, 2012

New ceiling height

The new rafters are put into place and the old rafters are cut out.  I left 18 inches on either side so that I can fabricate the soffit from those pieces that are already fastened to each wall pretty well.  Building the soffit this way will also make it easier for me to fabricate the soffit by myself, since I do all of my work solo.  :-)
You will notice that I left one of the home runs that goes to the second floor - since that will be the most difficult and require me to get enough wire to complete that re-run since I will be lengthening the run because of the added height of the ceiling.

I was originally only going to raise the ceiling 10 inches, but decided that I could definitely raise it about 18 based on the 2X12 roof rafters and how they will intersect the room.  What I didnt count on - after everything was done - was that I actually had a 2X14 hip rafter that protrudes into the room!!!!  See the next pictures - What to do!?!?!?!?

Monday, May 14, 2012

Drywall time

The vertical part of the soffit was put up, and drywall started to be hung.  Everything is starting to take shape!


And finally all of the drywall is hung and taped!

But WAIT - Whats that over there in the corner?
Yes, thats the 2X14 Hip Rafter PROTRUDING INTO MY PERFECT ROOM!!!